Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents
Note

You must unlock the Just Control Configuration window and stop the channel(s) to be able to make any changes.

Failover (optional)

Warning
  • The network settings of the mac running just:connect Just Connect must include a valid Router and DNS setting, otherwise parts of the failover workflow will not work.

  • Blackmagic ATEM driver version ATEM Switchers 7.2 or higher must be used. No other version can be used.

Starting with Version 1.0 of just:live & just:play it was possible to configure a Redundant Playout. With Version 2.0 we have added the ability to configure an optional Failover in case the Primary Playout Engine fails. The failover control is based on the Engine's status and can be used in a fully Redundant setup, where a Primary and a Redundant Engine is available, but also for Channels where only a Primary Engine is available.

Supported Devices

All Devices/Presets which can be configured using the Events tab can be used in case a failover switch is executed. This includes the ability to control video routers, video switches (supports also the ATEM media player), start/stop of just:in, GPI triggers, mail notification and more.

Behavior of the failover control

In case the primary just:out Just Out engine fails, the defined event presets will be executed and failover will switch to:

...

  • An additional signal which is added to the failover hardware

  • An additional signal which is added to the Blackmagic ATEM Failover mixer or an image which is stored in one of the ATEM's Media Player.

Setting up failover control

  1. Stop the desired Channel by deactivating the checkbox in front of it. Stopping a Channel will also stop the primary Just Out engine and therefore the final output in case no redundant engine is running.

  2. Select the Channel in the Devices & Channels list.

  3. Click on the Failover tab.

  4. Activate the checkbox right in front of Enable Failover Control.

  5. Click Add Events and add those events to the workflow, which you would like to be executed in case the Primary Engine or the Redundant Engine fails, or in case both engines are not running.

...

Info

Please keep in mind that there will be a delay between the engine fails and the time the switch is executed, depending on the delay defined for the just:out Just Out engine.

Workflow Status in the Playout User Interface

The status of the playout is also shown in the just:live/play user interface.

...